Gaussian WellWorks
Gaussian WellWorks About Us How We Work Digital Reservoir Twins Fracture Diagnostics Well-Rate Forecasting Reserve Estimation Storage Capacity Estimation Economic Appraisals Free Trial →
Step 4 of 4

Reserve Estimation

Probabilistic reserves estimation with P10/P50/P90 confidence intervals, PRMS compliant and certifiable.

Pre-drilling Reserves Estimation

Integrates the digital permeability twin with the Gaussian simulator to generate probabilistic production outcomes.

  • •Digital permeability twin coupled with Gaussian simulator
  • •Fully probabilistic production forecasting and reserves estimation

Acreage Value Optimization & Reserves Certification

Optimizes P90 volumes for acreage valuation and fair-value reporting, with probabilistic aggregation converging to P50 volumes.

  • •Certifiable reserves reporting
  • •Probabilistic aggregation converging to P50 volumes
  • •P90 optimization for acreage valuation and fair-value reporting

Reserves Certification — PRMS Compliant

Probabilistic reserves and resources classification aligned with PRMS guidelines by Society of Petroleum Engineers.

PRMS = Petroleum Resource Management System

Page Layout
Mode
Style
Color Palette
Logo Animation